Skip to content
Library Catalogue
  • Temporarily Saved: 0 saved temporarily (Limit of temporary saves is reached)
  • Need Help?
    • Contact
    • Search Tips
    • Tutorials
  • Additional Services
    • Acquisition Request
    • Course Reserves
    • Search History
    • Interlibrary Loan
  • Deutsch
  • Your account

    Your account

    • Checked out
    • Requested
    • Fines
    • Profile
    • Search History
  • Log Out
  • Login
  • Media
  • Articles
Advanced
  • Handbook factory planning and...
  • Cite this
  • Email this
  • Print
  • Export
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
    • Export to BibTeX
    • Export to Citavi
  • add to favourites
  • save temporarily Remove from Temporarily Saved
  • Permalink
Export abgeschlossen — 
Cover Image
Saved in:
Bibliographic Details
Title:Handbook factory planning and design
From: Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi
Person: Wiendahl, Hans-Peter
1938-2019
aut
Reichardt, Jürgen
Nyhuis, Peter
Rossi, Rett
1956-
1957-
Main Authors: Wiendahl, Hans-Peter 1938-2019 (Author), Reichardt, Jürgen 1956- (Author), Nyhuis, Peter 1957- (Author)
Other Authors: Rossi, Rett (Translator)
Format: Book
Language:English
German
Published: Berlin [und 4 weitere] Springer [2015]
Subjects:
Produktionsplanung
Fabrikplanung
Planung
Industriebetrieb
Online Access:http://www.gbv.de/dms/tib-ub-hannover/815962711.pdf
http://deposit.dnb.de/cgi-bin/dokserv?id=5129869&prov=M&dok_var=1&dok_ext=htm
http://www.springer.com/de/book/9783662463901
http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=028316633&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA
Item Description:Literaturangaben
Physical Description:XVIII, 501 Seiten Illustrationen, Diagramme 26 cm
ISBN:3662463903
9783662463901
Staff View

MARC

LEADER 00000nam a2200000 c 4500
001 BV042888023
003 DE-604
005 20180507
007 t|
008 150923s2015 xx a||| |||| 00||| eng d
015 |a 15N04  |2 dnb 
015 |a 15,A29  |2 dnb 
016 7 |a 1065084293  |2 DE-101 
020 |a 3662463903  |c Gb. : EUR 181.89 (DE)  |9 3-662-46390-3 
020 |a 9783662463901  |c Gb. : EUR 181.89 (DE)  |9 978-3-662-46390-1 
035 |a (OCoLC)913049290 
035 |a (DE-599)DNB1065084293 
040 |a DE-604  |b ger  |e rda 
041 1 |a eng  |h ger 
049 |a DE-703  |a DE-29T  |a DE-83  |a DE-860 
082 0 |a 620 
082 0 |a 658.503  |2 22/ger 
084 |a QP 550  |0 (DE-625)141903:  |2 rvk 
084 |a ZG 9220  |0 (DE-625)156051:  |2 rvk 
084 |a 650  |2 sdnb 
100 1 |a Wiendahl, Hans-Peter  |d 1938-2019  |0 (DE-588)115822216  |4 aut 
240 1 0 |a Handbuch Fabrikplanung 
245 1 0 |a Handbook factory planning and design  |c Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi 
264 1 |a Berlin [und 4 weitere]  |b Springer  |c [2015] 
264 4 |c © 2015 
300 |a XVIII, 501 Seiten  |b Illustrationen, Diagramme  |c 26 cm 
336 |b txt  |2 rdacontent 
337 |b n  |2 rdamedia 
338 |b nc  |2 rdacarrier 
500 |a Literaturangaben 
650 0 7 |a Produktionsplanung  |0 (DE-588)4047360-0  |2 gnd  |9 rswk-swf 
650 0 7 |a Fabrikplanung  |0 (DE-588)4134388-8  |2 gnd  |9 rswk-swf 
650 0 7 |a Planung  |0 (DE-588)4046235-3  |2 gnd  |9 rswk-swf 
650 0 7 |a Industriebetrieb  |0 (DE-588)4026813-5  |2 gnd  |9 rswk-swf 
689 0 0 |a Fabrikplanung  |0 (DE-588)4134388-8  |D s 
689 0 |5 DE-604 
689 1 0 |a Fabrikplanung  |0 (DE-588)4134388-8  |D s 
689 1 1 |a Produktionsplanung  |0 (DE-588)4047360-0  |D s 
689 1 |5 DE-604 
689 2 0 |a Industriebetrieb  |0 (DE-588)4026813-5  |D s 
689 2 1 |a Planung  |0 (DE-588)4046235-3  |D s 
689 2 |5 DE-604 
700 1 |a Reichardt, Jürgen  |d 1956-  |0 (DE-588)13354155X  |4 aut 
700 1 |a Nyhuis, Peter  |d 1957-  |0 (DE-588)121428176  |4 aut 
700 1 |a Rossi, Rett  |4 trl 
776 0 8 |i Erscheint auch als  |n Online-Ausgabe, PDF/ePub  |z 978-3-662-46391-8 
856 4 2 |m DE-601  |q pdf/application  |u http://www.gbv.de/dms/tib-ub-hannover/815962711.pdf  |3 Inhaltsverzeichnis 
856 4 2 |q text/html  |u http://deposit.dnb.de/cgi-bin/dokserv?id=5129869&prov=M&dok_var=1&dok_ext=htm  |3 Inhaltstext 
856 4 2 |q text/html  |u http://www.springer.com/de/book/9783662463901  |y Beschreibung & Leseproben  |3 Auszug 
856 4 2 |m DNB Datenaustausch  |q application/pdf  |u http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=028316633&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA  |3 Inhaltsverzeichnis 
943 1 |a oai:aleph.bib-bvb.de:BVB01-028316633 

Record in the Search Index

_version_ 1819247981991297024
adam_text CONTENTS 1 FACTORY CHANGE DRIVERS 1 1.1 INTRODUCTION 1 1.1.1 STAGNANT FACTORIES 1 1.1.2 PREVIOUS METHODS OF CORPORATE MANAGEMENT 3 1.1.3 COMPETITIVE FACTORS OF SUPERIOR ENTERPRISES 9 1.1.4 SUMMARY 11 BIBLIOGRAPHY 11 2 PLANNING BASIS 13 2.1 PRODUCTION STRATEGIES 13 2.2 FACTORY STRATEGIES 15 2.3 MARKET OFFER 15 2.4 BUSINESS PROCESSES 20 2.5 ASPECTS OF FACTORY DESIGN 21 2.6 MANUFACTURING LOCATION AND FACTORY 22 2.7 MORPHOLOGY OF FACTORY TYPES 23 2.8 SUMMARY 27 BIBLIOGRAPHY 28 3 PRODUCTION REQUIREMENTS 29 3.1 INTRODUCTION 29 3.2 RESPONSIVENESS 29 3.3 QUANTITY AND VARIANT FLEXIBILITY 31 3.4 FOCUSING ON LIMITS 35 3.5 SELF-ORGANIZATION AND PARTICIPATION 40 3.6 COMMUNICATION 42 3.7 NETWORKING AND COOPERATION 43 3.8 DEMOGRAPHIC DEVELOPMENT 47 3.9 CORPORATE CULTURE 48 3.9.1 ORGANIZATIONAL VIEW 48 3.9.2 ARCHITECTURAL VIEW 50 3.10 SUSTAINABILITY 52 3.10.1 THE TERM AND CONCEPT 52 3.10.2 CONSEQUENCES FOR FACTORY PLANNING 56 3.10.3 RECYCLING ECONOMY 58 IX HTTP://D-NB.INFO/1065084293 X 3.11 SUMMARY 60 BIBLIOGRAPHY 61 4 KNOWN PRODUCTION CONCEPTS 63 4.1 INTRODUCTION 63 4.2 F.W. TAYLOR 63 4.3 GROUP WORK 64 4.4 MANUFACTURING CELLS 67 4.5 FLEXIBLE MANUFACTURING SYSTEMS 69 4.6 MANUFACTURING SEGMENTS 69 4.7 LEAN PRODUCTION AND THE TOYOTA PRODUCTION SYSTEM 71 4.8 JUST-IN-TIME 75 4.9 FRACTAL ENTERPRISES 78 4.10 AGILITY ORIENTED COMPETITION 78 4.11 MASS CUSTOMIZATION 80 4.12 PRODUCTION STAGES CONCEPT 81 4.13 RESEARCH APPROACHES 84 4.14 SUMMARY 88 BIBLIOGRAPHY 89 5 SYSTEMATICS OF CHANGEABILITY 91 5.1 INTRODUCTION 91 5.2 FLEXIBILITY 91 5.3 RECONFIGURABILITY 96 5.4 CHANGEABILITY AND CHANGE ENABLERS 96 5.5 ASPECTS OF DESIGNING CHANGEABILITY 102 5.6 MORPHOLOGY OF CHANGEABILITY 103 5.7 CLASSES OF CHANGEABILITY FOR PRODUCTION PERFORMANCE 106 5.8 EVALUATING CHANGEABILITY 109 5.9 VISION OF THE CHANGEABLE FACTORY 114 5.10 SUMMARY 116 BIBLIOGRAPHY 117 6 FUNCTIONAL DESIGN OF WORKPLACES 119 6.1 DESIGN ASPECTS 119 6.2 PRODUCTION TECHNOLOGY 122 6.2.1 MANUFACTURING PROCESSES 122 6.2.2 ASSEMBLY METHODS 126 6.2.3 LOGISTIC PROCESSES 132 6.3 FACILITIES 140 6.3.1 MANUFACTURING FACILITIES 141 6.3.2 ASSEMBLY SYSTEMS 149 6.3.3 LOGISTICAL RESOURCES 158 6.4 SUMMARY 166 BIBLIOGRAPHY 166 XI 7 DESIGNING WORKPLACES FROM A WORK ORGANIZATIONAL PERSPECTIVE BY DETLEF GERST 169 7.1 HUMAN RESOURCES AS A CONCEPT 169 7.2 HUMAN RESOURCES AND PRODUCTION PERFORMANCE 170 7.3 COMPETENCY AND HUMAN RESOURCES DEVELOPMENT .... 170 7.3.1 PROFESSIONAL COMPETENCE 171 7.3.2 STRATEGIES FOR DEVELOPING COMPETENCE 172 7.3.3 HUMAN RESOURCES DEVELOPMENT 174 7.4 WORK STRUCTURING 175 7.5 MOTIVATION 177 7.6 DESIGNING REMUNERATION SYSTEMS 179 7.7 PLANNING WORKING TIMES 184 7.8 INFLUENCE OF DEMOGRAPHIC CHANGE 189 7.9 SUMMARY 192 BIBLIOGRAPHY 192 8 SPATIAL WORKPLACE DESIGN 197 8.1 ERGONOMICS 197 8.2 ROOM INTERIORS 200 8.3 COLOR DESIGN 202 8.3.1 PSYCHOLOGICAL IMPACT OF COLOR 202 8.3.2 SAFETY COLORS AND IDENTIFICATION OF MEDIA LINES 203 8.3.3 HOLISTIC COLOR SCHEMES : . . . 203 8.4 OCCUPATIONAL HEALTH AND SAFETY STANDARDS 204 8.4.1 OVERVIEW 204 8.4.2 WORKPLACE REGULATIONS 204 8.4.3 PARTICIPATION 206 8.4.4 TREAD CERTAINTY AND PROTECTION AGAINST FALL 207 8.4.5 PROTECTION FROM HAZARDOUS SUBSTANCES 208 8.4.6 NOISE PROTECTION AND REDUCTION 208 8.4.7 PROTECTION FROM THERMAL RADIATION AND VIBRATIONS 209 8.4.8 ELECTRICAL SAFETY AND PROTECTION FROM RADIATION 212 8.5 SUMMARY 212 BIBLIOGRAPHY 212 9 FUNCTIONAL DESIGN OF WORK AREAS 215 9.1 OVERVIEW OF DESIGN ASPECTS 215 9.2 CUSTOMER ORDER DECOUPLING POINT 216 9.3 APPROACHES TO HANDLING ORDERS 217 9.4 ORDER TYPES 219 9.5 PROCESS MODELS 220 9.5.1 PROCUREMENT MODELS 220 9.5.2 PRODUCTION MODELS 222 9.5.3 DELIVERY MODELS 222 9.6 MANUFACTURING AND ASSEMBLY PRINCIPLES 223 XII 9.7 PRODUCTION SEGMENTS 226 9.8 PRODUCTION PLANNING AND CONTROL 227 9.9 SELECTING AND CONFIGURING A PRODUCTION CONTROL METHOD 230 9.10 SUMMARY 236 BIBLIOGRAPHY 237 10 SPATIAL WORKSPACE DESIGN 239 10.1 COMMUNICATION 239 10.1.1 CORRIDORS, STAIRWELLS, INTERMEDIARY SPACES. . . . 240 10.1.2 ARRANGING AND LINKING WORKSPACES 242 10.1.3 LOCATION, SHAPE AND FURNISHINGS OF COMMON AREAS 244 10.2 LIGHTING 244 10.2.1 DAYLIGHT 245 10.2.2 NATURAL LIGHTING 246 10.2.3 ARTIFICIAL LIGHTING 248 10.2.4 REDIRECTING LIGHT 251 10.3 COMFORT 252 10.4 RELAXATION 255 10.4.1 BREAK-OUT AREAS AND SOCIAL ROOMS 255 10.4.2 CANTEEN, CAFETERIA, COFFEE CORNERS 255 10.4.3 SPORT, RECREATION AND SPARE TIME 255 10.5 FIRE PROTECTION 256 10.5.1 FIRE PROTECTION CONCEPT AND FIRE COMPARTMENT 257 10.5.2 CLEARANCES, FIREWALLS AND COMPLEX SEPARATION WALLS 257 10.5.3 FIRE RESISTANCE RATING CLASSES 259 10.5.4 EVACUATION AND RESCUE ROUTES 260 10.5.5 SMOKE AND HEAT DUCTS, FIRE EXTINGUISHING EQUIPMENT 261 10.6 SUMMARY 262 BIBLIOGRAPHY 262 11 BUILDING DESIGN 265 11.1 LOAD-BEARING STRUCTURE 267 11.1.1 PROJECT REQUIREMENTS AND LOAD ASSUMPTION 267 11.1.2 BUILDING STRUCTURE FORM AS A STATIC SYSTEM 269 11.1.3 SPAN WIDTH 272 11.1.4 SELECTING THE MATERIALS AND JOINING PRINCIPLE 273 11.1.5 PROFILING SUPPORT COLUMNS, BEAMS AND CEILING SLABS 276 11.2 SHELLS 277 11.2.1 PROTECTIVE FUNCTIONS 278 11.2.2 PRODUCTION AND LOGISTICS 279 XIII 11.2.3 LIGHTING, VIEWS, COMMUNICATION 280 11.2.4 ECOLOGY AND ENERGY PRODUCTION 281 11.3 BUILDING SERVICES 282 11.3.1 SUPPLY AND REMOVAL SYSTEMS 283 11.3.2 TECHNICAL CENTERS 284 11.3.3 MAIN ROUTINGS 286 11.3.4 LINE NETS 287 11.3.5 INLETS AND OUTLETS 287 11.3.6 BUILDING SERVICES 288 11.4 INTERIOR FINISHING 298 11.4.1 FLOORS 299 11.4.2 WALLS 301 11.4.3 CEILINGS 302 11.4.4 CORES 304 11.4.5 STAIRS 305 11.5 EXAMPLES OF CHANGEABLE BUILDINGS 305 11.6 GRACE AND AESTHETICS 306 11.6.1 STRUCTURAL ORDER 307 11.6.2 SIMPLICITY 308 11.6.3 BALANCE BETWEEN UNITY AND DIVERSITY 308 11.6.4 DISTINCTIVENESS 308 11.6.5 EMOTIONAL QUALITY, ATMOSPHERE 308 11.7 SUMMARY 309 BIBLIOGRAPHY . 309 12 MASTER BUILDING PLAN 311 12.1 REQUEST PROGRAM 311 12.1.1 REQUIRED FLOOR SPACE AND ROOM LIST 311 12.1.2 PROCESS AND LOGISTICS ELEMENTS 314 12.1.3 SUPPLY AND REMOVAL 315 12.1.4 SPECIAL REQUIREMENTS 317 12.2 BUILDING TYPOLOGY 317 12.2.1 SECTIONAL PROFILE 318 12.2.2 OUTLINE FIGURE 320 12.2.3 LINKING PRINCIPLE 322 12.3 PROPERTY PROTECTION 322 12.3.1 BURGLARY, THEFT 322 12.3.2 FIRE AND EXPLOSION PREVENTION 324 12.4 GENERAL DEVELOPMENT (MASTER PLAN) 324 12.4.1 PROCEDURE 324 12.4.2 ZONING AND ORGANIZATIONAL GRID 325 12.4.3 INFRASTRUCTURE, SUPPLY AND REMOVAL SYSTEMS 326 12.4.4 BUILDINGS AND OPEN SPACES 327 12.5 SUMMARY 329 BIBLIOGRAPHY 329 XIV 13 SITE PLANNING FROM SPACE VIEW 331 13.1 SITE DEVELOPMENT 331 13.2 UTILITIES SUPPLY AND DISPOSAL 332 13.3 PLOT 333 13.3.1 GEOMETRIC PROPERTIES 333 13.3.2 SOIL CHARACTERISTICS 334 13.3.3 OBSTACLES AND EDIFICES 335 13.4 LAWS AND REGULATIONS 335 13.5 SITE EVALUATION 336 13.6 ENVIRONMENTAL ASPECTS 338 13.7 SUMMARY 338 BIBLIOGRAPHY 339 14 STRATEGIC LOCATION PLANNING 341 14.1 INTRODUCTION 341 14.2 LOCATION PLANNING TRIGGERS 341 14.3 SUITABILITY OF THE CURRENT STRUCTURE 343 14.4 LOCATION FACTORS 345 14.5 PROCEDURE FOR SELECTING A LOCATION 350 14.6 ESTABLISHING PRODUCTION STAGES 352 14.7 SUMMARY 358 BIBLIOGRAPHY 358 15 THE SYNERGETIC FACTORY PLANNING PROCESS 361 15.1 PLANNING APPROACH 361 15.2 PROCESS MODEL 365 15.3 GOAL SETTING 373 15.3.1 MAIN STEPS 373 15.3.2 SITE LOGISTIC PROFILE 374 15.3.3 ENVIRONMENT ANALYSIS 376 15.3.4 FACTORS FOR SUCCESS 377 15.3.5 CHANGE DRIVERS 377 15.3.6 CREATING SCENARIOS 378 15.3.7 FINDING A VISION 381 15.3.8 GENEERING 381 15.3.9 FIELDS OF ACTION 383 15.4 BASE ANALYSIS 384 15.4.1 OBJECT DATA 386 15.4.2 PROCESS ANALYSIS 389 15.5 CONCEPT PLANNING 394 15.5.1 STRUCTURAL DESIGN 395 15.5.2 DIMENSIONING OF THE STRUCTURE 399 15.5.3 ROUGH LAYOUT PLANNING 405 15.6 DETAILED PLANNING 415 15.6.1 TRANSPORTATION ROUTE SYSTEM 415 15.6.2 FINE LAYOUT 415 XV 15.7 ENERGY EFFICIENCY 419 15.7.1 OVERVIEW 419 15.7.2 CERTIFICATION SYSTEMS 423 15.7.3 CASE STUDIES 424 15.8 PREPARATIONS FOR REALIZATION 430 15.9 SUPERVISING THE REALIZATION 431 15.10 MANAGING THE RAMP-UP 432 15.11 SUMMARY 432 BIBLIOGRAPHY 432 16 PROJECT MANAGEMENT 435 16.1 TASKS OF PROJECT MANAGEMENT 435 16.1.1 STUMBLING BLOCKS 435 16.1.2 TASK OVERVIEW 436 16.2 PROJECT ORGANIZATION 438 16.2.1 TEAM BUILDING 438 16.2.2 EXAMPLE OF A PROJECT ORGANIZATION 439 16.2.3 RULES FOR PROJECT TEAM 440 16.3 PROJECT PLAN DEVELOPMENT 441 16.4 PROJECT CAPACITY PLANNING 444 16.5 CONTRACT DRAFTING 444 16.5.1 GENERAL 444 16.5.2 AWARD VARIANTS 445 16.5.3 ADVANTAGES AND DISADVANTAGES OF AWARD VARIANTS 446 16.5.4 LIABILITY ISSUES 446 16.6 PROJECT MANUAL 447 16.7 COSTING AND CONTROL 447 16.7.1 CONDITIONS FOR DETERMINING COSTS 448 16.7.2 COSTS IN BUILDING CONSTRUCTION 449 16.7.3 USAGE COSTS IN BUILDING CONSTRUCTION (ACCORDING TO GERMAN DIN 18960) 450 16.7.4 COST MANAGEMENT 452 16.8 DIGITAL FACTORY 454 16.8.1 CONCEPT 454 16.8.2 DIGITAL TOOLS 458 16.8.3 SIMULATION EXAMPLE 460 16.9 BUILDING INFORMATION MODELING 462 16.9.1 INTRODUCTION 462 16.9.2 EVALUATION OF THE BUILDING INFORMATION MODEL 464 16.9.3 CONCLUSION 470 16.10 SUMMARY 471 BIBLIOGRAPHY 471 17 FACILITIES MANAGEMENT 473 17.1 HISTORY AND DEFINITION 473 17.2 TASKS AND DELIMITATION 474 XVI 17.3 FACILITIES MANAGEMENT IN THE LIFE CYCLE OF AN OBJECT 475 17.3.1 DEVELOPMENT PHASE 475 17.3.2 IMPLEMENTATION PHASE 476 17.3.3 OPERATING PHASE 478 17.3.4 CONVERSION PHASE 478 17.3.5 DECOMMISSIONING PHASE 479 17.4 FACILITY MANAGEMENT SYSTEMS 479 17.4.1 FUNCTIONS 479 17.4.2 STRUCTURE OF DATA MODELS 480 17.4.3 VIRTUAL PROJECT SPACE 486 17.4.4 NAVIGATION 486 17.4.5 SELECTION OF A CAFM SYSTEM 488 17.5 APPLICATIONS OF FACILITY MANAGEMENT 489 17.5.1 MINIMIZING MAINTENANCE COSTS 489 17.5.2 PREVENTION OF ALLOCATION CONFLICTS 490 17.5.3 SPATIAL PLANNING 490 17.5.4 LOCK MANAGEMENT AND KEY MANAGEMENT.... 491 17.5.5 COSTS AND BUILDING STATE CONTROL 491 17.5.6 REPORTING 491 17.5.7 FIRE PROTECTION 491 17.6 MODELING OF FM PROCESSES 492 17.7 CASE STUDIES 493 17.7.1 PHOENIX AG HAMBURG 493 17.7.2 LONDA ROTHENKIRCHEN 493 17.8 SUMMARY 496 BIBLIOGRAPHY 496 INDEX 497
any_adam_object 1
author Wiendahl, Hans-Peter 1938-2019
Reichardt, Jürgen 1956-
Nyhuis, Peter 1957-
author2 Rossi, Rett
author2_role trl
author2_variant r r rr
author_GND (DE-588)115822216
(DE-588)13354155X
(DE-588)121428176
author_facet Wiendahl, Hans-Peter 1938-2019
Reichardt, Jürgen 1956-
Nyhuis, Peter 1957-
Rossi, Rett
author_role aut
aut
aut
author_sort Wiendahl, Hans-Peter 1938-2019
author_variant h p w hpw
j r jr
p n pn
building Verbundindex
bvnumber BV042888023
classification_rvk QP 550
ZG 9220
ctrlnum (OCoLC)913049290
(DE-599)DNB1065084293
dewey-full 620
658.503
dewey-hundreds 600 - Technology (Applied sciences)
dewey-ones 620 - Engineering and allied operations
658 - General management
dewey-raw 620
658.503
dewey-search 620
658.503
dewey-sort 3620
dewey-tens 620 - Engineering and allied operations
650 - Management and auxiliary services
discipline Technik
Wirtschaftswissenschaften
format Book
fullrecord <?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>02722nam a2200637 c 4500</leader><controlfield tag="001">BV042888023</controlfield><controlfield tag="003">DE-604</controlfield><controlfield tag="005">20180507 </controlfield><controlfield tag="007">t|</controlfield><controlfield tag="008">150923s2015 xx a||| |||| 00||| eng d</controlfield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">15N04</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="015" ind1=" " ind2=" "><subfield code="a">15,A29</subfield><subfield code="2">dnb</subfield></datafield><datafield tag="016" ind1="7" ind2=" "><subfield code="a">1065084293</subfield><subfield code="2">DE-101</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">3662463903</subfield><subfield code="c">Gb. : EUR 181.89 (DE)</subfield><subfield code="9">3-662-46390-3</subfield></datafield><datafield tag="020" ind1=" " ind2=" "><subfield code="a">9783662463901</subfield><subfield code="c">Gb. : EUR 181.89 (DE)</subfield><subfield code="9">978-3-662-46390-1</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(OCoLC)913049290</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DNB1065084293</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-604</subfield><subfield code="b">ger</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1="1" ind2=" "><subfield code="a">eng</subfield><subfield code="h">ger</subfield></datafield><datafield tag="049" ind1=" " ind2=" "><subfield code="a">DE-703</subfield><subfield code="a">DE-29T</subfield><subfield code="a">DE-83</subfield><subfield code="a">DE-860</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">658.503</subfield><subfield code="2">22/ger</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">QP 550</subfield><subfield code="0">(DE-625)141903:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">ZG 9220</subfield><subfield code="0">(DE-625)156051:</subfield><subfield code="2">rvk</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">650</subfield><subfield code="2">sdnb</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Wiendahl, Hans-Peter</subfield><subfield code="d">1938-2019</subfield><subfield code="0">(DE-588)115822216</subfield><subfield code="4">aut</subfield></datafield><datafield tag="240" ind1="1" ind2="0"><subfield code="a">Handbuch Fabrikplanung</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Handbook factory planning and design</subfield><subfield code="c">Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="a">Berlin [und 4 weitere]</subfield><subfield code="b">Springer</subfield><subfield code="c">[2015]</subfield></datafield><datafield tag="264" ind1=" " ind2="4"><subfield code="c">© 2015</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">XVIII, 501 Seiten</subfield><subfield code="b">Illustrationen, Diagramme</subfield><subfield code="c">26 cm</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">Literaturangaben</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Planung</subfield><subfield code="0">(DE-588)4046235-3</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="650" ind1="0" ind2="7"><subfield code="a">Industriebetrieb</subfield><subfield code="0">(DE-588)4026813-5</subfield><subfield code="2">gnd</subfield><subfield code="9">rswk-swf</subfield></datafield><datafield tag="689" ind1="0" ind2="0"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="0" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="1" ind2="0"><subfield code="a">Fabrikplanung</subfield><subfield code="0">(DE-588)4134388-8</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2="1"><subfield code="a">Produktionsplanung</subfield><subfield code="0">(DE-588)4047360-0</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="1" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="689" ind1="2" ind2="0"><subfield code="a">Industriebetrieb</subfield><subfield code="0">(DE-588)4026813-5</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2="1"><subfield code="a">Planung</subfield><subfield code="0">(DE-588)4046235-3</subfield><subfield code="D">s</subfield></datafield><datafield tag="689" ind1="2" ind2=" "><subfield code="5">DE-604</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Reichardt, Jürgen</subfield><subfield code="d">1956-</subfield><subfield code="0">(DE-588)13354155X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Nyhuis, Peter</subfield><subfield code="d">1957-</subfield><subfield code="0">(DE-588)121428176</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Rossi, Rett</subfield><subfield code="4">trl</subfield></datafield><datafield tag="776" ind1="0" ind2="8"><subfield code="i">Erscheint auch als</subfield><subfield code="n">Online-Ausgabe, PDF/ePub</subfield><subfield code="z">978-3-662-46391-8</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DE-601</subfield><subfield code="q">pdf/application</subfield><subfield code="u">http://www.gbv.de/dms/tib-ub-hannover/815962711.pdf</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="q">text/html</subfield><subfield code="u">http://deposit.dnb.de/cgi-bin/dokserv?id=5129869&amp;prov=M&amp;dok_var=1&amp;dok_ext=htm</subfield><subfield code="3">Inhaltstext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="q">text/html</subfield><subfield code="u">http://www.springer.com/de/book/9783662463901</subfield><subfield code="y">Beschreibung &amp; Leseproben</subfield><subfield code="3">Auszug</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="m">DNB Datenaustausch</subfield><subfield code="q">application/pdf</subfield><subfield code="u">http://bvbr.bib-bvb.de:8991/F?func=service&amp;doc_library=BVB01&amp;local_base=BVB01&amp;doc_number=028316633&amp;sequence=000001&amp;line_number=0001&amp;func_code=DB_RECORDS&amp;service_type=MEDIA</subfield><subfield code="3">Inhaltsverzeichnis</subfield></datafield><datafield tag="943" ind1="1" ind2=" "><subfield code="a">oai:aleph.bib-bvb.de:BVB01-028316633</subfield></datafield></record></collection>
id DE-604.BV042888023
illustrated Illustrated
indexdate 2024-12-20T17:22:26Z
institution BVB
isbn 3662463903
9783662463901
language English
German
oai_aleph_id oai:aleph.bib-bvb.de:BVB01-028316633
oclc_num 913049290
open_access_boolean
owner DE-703
DE-29T
DE-83
DE-860
owner_facet DE-703
DE-29T
DE-83
DE-860
physical XVIII, 501 Seiten Illustrationen, Diagramme 26 cm
publishDate 2015
publishDateSearch 2015
publishDateSort 2015
publisher Springer
record_format marc
spellingShingle Wiendahl, Hans-Peter 1938-2019
Reichardt, Jürgen 1956-
Nyhuis, Peter 1957-
Handbook factory planning and design
Produktionsplanung (DE-588)4047360-0 gnd
Fabrikplanung (DE-588)4134388-8 gnd
Planung (DE-588)4046235-3 gnd
Industriebetrieb (DE-588)4026813-5 gnd
subject_GND (DE-588)4047360-0
(DE-588)4134388-8
(DE-588)4046235-3
(DE-588)4026813-5
title Handbook factory planning and design
title_alt Handbuch Fabrikplanung
title_auth Handbook factory planning and design
title_exact_search Handbook factory planning and design
title_full Handbook factory planning and design Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi
title_fullStr Handbook factory planning and design Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi
title_full_unstemmed Handbook factory planning and design Hans-Peter Wiendahl, Jürgen Reichardt, Peter Nyhuis ; translated by Rett Rossi
title_short Handbook factory planning and design
title_sort handbook factory planning and design
topic Produktionsplanung (DE-588)4047360-0 gnd
Fabrikplanung (DE-588)4134388-8 gnd
Planung (DE-588)4046235-3 gnd
Industriebetrieb (DE-588)4026813-5 gnd
topic_facet Produktionsplanung
Fabrikplanung
Planung
Industriebetrieb
url http://www.gbv.de/dms/tib-ub-hannover/815962711.pdf
http://deposit.dnb.de/cgi-bin/dokserv?id=5129869&prov=M&dok_var=1&dok_ext=htm
http://www.springer.com/de/book/9783662463901
http://bvbr.bib-bvb.de:8991/F?func=service&doc_library=BVB01&local_base=BVB01&doc_number=028316633&sequence=000001&line_number=0001&func_code=DB_RECORDS&service_type=MEDIA
work_keys_str_mv AT wiendahlhanspeter handbuchfabrikplanung
AT reichardtjurgen handbuchfabrikplanung
AT nyhuispeter handbuchfabrikplanung
AT rossirett handbuchfabrikplanung
AT wiendahlhanspeter handbookfactoryplanninganddesign
AT reichardtjurgen handbookfactoryplanninganddesign
AT nyhuispeter handbookfactoryplanninganddesign
AT rossirett handbookfactoryplanninganddesign
  • Availability

System Under Maintenance

Request via interlibrary loan Request via interlibrary loan Table of Contents
  • Legal Notice
  • Data Privacy
  • Accessibility
  • Contact